01
The market got messy
Somewhere between the GPU shortage and the AI buildout, standing up real infrastructure became a maze of vendors, lead times, and half-answers.
Start a conversation →CTS Solutions — Compute Infrastructure
CTS Solutions scopes, engineers, and operates supercomputing, data center, AI, and edge infrastructure for organizations that can't afford to get it wrong.
42 MW
▪ Capacity under management
Capabilities
01 — Supercomputing
Node architecture, interconnect topology, and scheduling designed around your workloads. Not a reference architecture.
02 — Data Center Technology
Power, cooling, and rack design for the loads modern silicon actually draws. Liquid-ready from day one.
03 — AI Infrastructure
GPU fleets, storage fabrics, and orchestration tuned for utilization. Idle accelerators are the most expensive kind.
04 — Edge Computing
Distributed sites engineered for low latency, resilience, and lights-out operation.
Compute is the new heavy industry.
We build its foundation.
Process
01
Tell us what you're building. We turn requirements into a concrete plan: capacity, power, budget, timeline.
02
We design the full stack: silicon selection, thermals, network, facility. You see every decision before it's made.
03
We stand it up, bring it online, and stay accountable for how it runs.
Infrastructure
Thermals
Direct-to-chip and rear-door systems sized for the racks you'll run in three years, not the ones you ran three years ago.
Fabric
Topology, switching, and cabling planned so your accelerators spend their time computing.
Power
From utility feed to busway to PDU, sized with headroom and metered where it matters.
Operations
Monitoring, remote hands, and failure playbooks built in from commissioning day.
Why CTS
More compute per rack, per watt, per dollar.
PUE engineered down, not reported around.
Designed for failure, so you never notice one.
One partner. One number to call. No vendor maze.
About
Somewhere between the GPU shortage and the AI buildout, serious infrastructure became a maze of vendors, lead times, and half-answers. We compress that maze into one accountable team.
01
Somewhere between the GPU shortage and the AI buildout, standing up real infrastructure became a maze of vendors, lead times, and half-answers.
Start a conversation →02
The people who spec the system are the same people who engineer it, bring it online, and stand in the hot aisle when it ships.
Start a conversation →03
We do not sell hardware off a shelf. We take responsibility for what gets built, how it deploys, and how it runs.
Start a conversation →Do business with us
No products. No portal. If you want to work with CTS Solutions, you talk to us directly — every inquiry lands on the same desk.